El Dorado Irrigation District awards Granite Construction Folsom Lake Intake contract
The intake, a pump house at the edge of the lake in El Dorado Hills, was built in 1958, and got additional pumps installed in 1994. Both systems are at the end of their useful life and have become unreliable in recent years. The intake … plays a critical role in supplying drinking water to El Dorado Hills.