Arroyo Seco Canyon project supporters hope to create local reliance on water supply
The proposed structure will span the width of the existing channel and feature an operable weir crest gate that can be raised for diversion to the intake structure and lowered to bypass diversions. An engineered roughened channel will be constructed in the section of the stream directly downstream of the diversion structure for future fish passage. The new intake will be equipped with a trash rack and fish screens.