PG&E receives approval for Rio Dell energy project
Pacific Gas and Electric Company’s Rio Dell feeder project, which will provide more reliable and increased electrical capacity, has received approval from the California State Lands Commission. … The project includes the installation of two 20-inch conduit castings under the Eel River, using Horizontal Directional Drilling. The Horizontal Directional Drilling method is a trenchless technique meant to avoid disturbance along the bore path to minimize impacts to waterways and sensitive habitats. … Permits are still needed from the California Department of Fish and Wildlife and the North Coast Regional Water Quality Control Board.
